About Erosion Control

The removal of natural vegetation and topsoil during the initial stage of construction is possibly the most environmentally dangerous period of time during any earth moving project. The construction site becomes particularly susceptible to erosion, potentially transforming existing drainage areas and the disturbance of environmentally sensitive areas. it is important to minimize the areas of disturbed soils and the duration of exposure. It is also imperative to control storm water and sedimentation runoff throughout the stages of construction. Having a soil erosion control plan in place helps to minimize or prevent the extent of disturbance by controlling the amount of soil run off and by stabilizing the exposed soils.

Contact Us